• Global
  • United States
  • Canada
  • Australia
  • Germany
  • Sweden
  • France
  • Spain
  • Italia
  • Brazil
  • Russia
  • Poland
  • China
  • India
  • Login
Category image

Suction mats

Prior to trowelling, the concrete can be vacuumed with the DYNAPAC BA41 / BB mats vacuum set in order to ensure quick concrete consolidation and obtain maximum compressive strength.

Category image

Vacuum pump

Used whenever the time-schedule is tight, when trowelling should start only a few hours after pouring, the BA41 allows to treat up to 60 sqm at once. Vacuum treatment is used right after internal vibration or beam vibration has been performed, and trowelling can start immediately upon removing the suction mats.